As a result of the February Midwest blizzard the Burlington Northern Santa Fe operated their Jordan spreader over many of their Illinois lines. On February 5th the plow work train is at Waterman,... (more)
A fully stocked Pueblo Yard is active this morning with the Minnequa local building its train, and other BNSF moves occurring all over.
With a consist that a 7 year old might have created; four autoracks, three tank cars, a single well car, and an ATSF caboose; the Minnequa Local is preparing to depart before 844 clogs of up the r... (more)
After setting a bad ordered flat car off at maintenance, the power for the yard returns to building trains. Directly above 1719, the "Hill Cut" job that runs to Evraz Steel and the Vestas plant is... (more)
A new arrival to Pueblo from the night before switches an empty rail flatcar during its morning train building routine and has taken the top spot away from more)
Still recovering from the blizzard that we had 3 days prior to this, the BNSF set out a Jordan Spreader to remove a majority of the snow away from the ROW.